Cruise Tail (Mooring)

Up on top: high-quality, durable tail with handling edge.

Cruise Tail (Mooring)

Breaking Loads and Weights

Elongation at 10% of break load 1.8 %
Ø [mm] kg/100 m

Spliced break load [kN]*

Bl. linear [kN]**

Break length [km]***
82 211.82 374.4 416 18
90 243.64 456 507 19
98 311.82 558.4 620 18
106 369.09 656.1 729 18
114 426.36 760 844 18
122 497.27 888 987 18
130 560.91 1,001.7 1,113 18
138 637.27 1,136 1,262 18
146 704.55 1,262.4 1,403 18
154 800 1,431.9 1,591 18
170 975.45 1,760 1,956 18
186 1,182.73 2,128 2,364 18
202 1,406.36 2,520 2,800 18
218 1,649.09 2,952 3,280 18
234 1,907.27 3,408 3,787 18
250 2,188.18 3,904 4,338 18
266 2,484.55 4,432 4,924 18
282 2,803.64 4,992 5,547 18

*   Spliced break load
**  Break load in accordance with DIN EN ISO 2307
*** Break length in spliced condition

  • Buoyant: round braid made of light Plus yarns endlessly spliced as a grommet
  • Durable: overbraided stretch zone and eye protection with additional impregnation
  • Uncomplicated: best handling due to the bundled braiding of the two rope strands

Load / Elongation curve

% of Bl.
% Elongation